Hi
One of my DTP process got stuck at Yellow status for very long (around 2 hours), even though data has finished loading, and the transformation has finished.
A check on SM37 reveals the following:
1. All records forwarded
2. Technical Status "Green"
And then it tried to do the following:
"Status Transition 8/8 to 8/8 completed successfully"
multiple times for 1.5 hours, before it ended with "Set Overall Technical Status to Green"
I noticed it's getting longer and longer.
Previously it took 1 hours 50 mins, then now it took 2 hours, 16 mins.
Pls advise how I can rectify this?
Your advice is much appreciated
Rgds